Tuesday, April 23, 2019

Greetings All, we have been busy in the layout room over this winter season. Head over to the updates page and our You Tube channel to check out the items we have been working on and have completed. Or you can click on the link at the right to view the pages.





We have all of the scenery in on the creamery module and we are working out the final bugs on our grade crossing. We hope to be adding a sound module and censors soon we have worked out most of the bugs with them now.

Wednesday, April 11, 2018

Work is moving forward!



Work has again began to move forward on the layout I am making head way on the new creamery module and other items of the work list. Check out all the new additions here.
 



New Tier 4 Locomotive Power Arrives At Grafton Yard.



The first of two new tier 4 locos to arrive at Grafton Yard check them out HERE.






Wednesday, January 17, 2018

New Passenger cars added to the fleet

The Shops at Grafton yard have been working hard to complete several outstanding projects. Lets take a peek at what they have been up to.


Thursday, February 16, 2017

Flooding on Maine Central's Grafton Branch

Do not worry though federal State and Local authorities are on the scene assessing the damage now.....
A few weeks back I came home from work to find the ice maker supply line to our fridge had busted and leaked about 2 inches of water all over the kitchen. I immediately ran down stairs to shut off the supply to the fridge and found that I had about 6 inches of standing water in the train room. Oh no disaster! Well it wasn't as bad as I thought I'll explain. Yes the layout did suffer water damage however most of the water had ran off the layout and onto the floor in the room this was short work for our trusty wet vac. The kitchen you ask, fine other than some minor damage on the kick boards we cleaned the whole mess up in about an hour or so. The damage that had me concerned on the layout was on the junction and town modules, a complete loss. I had used plaster on these modules as these where the first ones I made and had not yet transferred to foam. I was able to save most of the saw mill portion of the junction module once it dried out however the town was a total loss along with the track work leading up to the town and the Wye. Long story short I demoed the module and replaced it with a new one only this time I used foam and added a helix in the module the following pics will explain thing a little more. I took these photos while construction was on going the photos do not go in order but give you an idea of how we built the helix and constructed things.

Another view of the first rings
Start of helix from staging
First three rings started
Currently I have the helix complete I still need to work out some kinks in the track work and finalize all the temporary supports. I am just impressed it works! The helix has a single track at a 22" radius with the last ring a 18"-19" radius ( miss judged my measuring). The first three rings are a 2.75 +/- grade with the fourth a 4% grade. Some will argue too steep of grades however the helix is coming from staging to the main level of the layout and since the biggest piece of rolling stock that will likely travel the helix will be a 50' box car and the trains are only going to be about 5-10 cars long I'm not to concerned with the grade.



 The final part of construction will be to enclose the top of the helix with the new town bench work. This will get completed once I finish all the rock formation and finalize the new track plan. One other item to note is I lost my MRC prodigy advance2 to the incident. So I have not ran trains on the layout for a month or so just limited runs testing track with my Sprog programmer. That will soon change though I ordered a new NCE system the other day!


Phase 2 of the build is to layout and construct the lower level of the layout. Yup you heard right a three level layout in a 12' x 17' room. I was forced to go this route because what I had planned for additional space for trains has now become the new family media room.

Sunday, August 14, 2016

New additions to the engine roster


The guys in the engine shops have done it again. This time they unveiled three new engine to be added to the fleet. Vermont Railway locos 201,603 and 006. Check out the pictures here.

New engine shops at Grafton yard

The new shops at Grafton are almost done. 
I have been working on the new shop portion of the layout for the last few months or so.




I still have to touch up a few things and add weathering to the building but over all the project is mostly complete.

 I detailed the interior of the shops with tool boxes and machines. I also added safety markings on the poles.









Here is a few more pictures of the exterior. I used a Walther's kit to create the scene I still have to scenic the area and hope to have that done soon.




Monday, February 8, 2016

03/31/2016

UPDATE:

I have been working on the bridge area of the layout and have completed the plastering and fitment of the piers and abutments. Also I have started the scenery. Once I am finished with this section I plan to move on to the mill area where I have been laying out the track work. Check out the pictures here or click on the updates link on the left side of the page.

02/08/2016

I have done a lot of  work on the improvements to the truss bridge check them out here or navigate to the layout updates page.

Wednesday, February 3, 2016

A new start

Happy NEW YEAR!!!

Well it's been several months since I have done anything on the layout or even thought about running trains. I have been either too busy or have had no ambition to work on the layout. This is all going to change. I have several tasks lined up in front of me. The first is a major cleaning in the train room and workbench areas they are, well lets say a F5 tornado would be child's play compared to the current state things are in. Once I get the mess organized and clean its down to business. First order is out standing projects I have several loco projects that are unfinished or in near completion states. I will be doing my best to get these completed so that I can have the room and focus on the next issue I have been meaning to tackle which is the bridge spanning the junction and the "mill/brewery" scene. I built this section in a hurry to get trains up and running and well frankly I hate the current design so back to the drawing board. I will keep the bridge layout and track plan more or less but totally redo the scenery and bridge supports.

 Another item on my list is to finally go through and edit all the videos I have been making for the YouTube channel I have a lot of material to edit and it will take some time to compile it all.
Please bear with me as I get things organized and moving forward. I will be making a more proactive approach to post something every month at least for the you tube channel and this blog. The over all plan for the layout this year is to finish the major scenery and track work so I can start planning the second part of the layout. A helix to a lower level about 30" or so off the ground. It is undetermined if this will be solely for staging or scenic-ed yet. Please stay tuned for further updates
 

Saturday, August 29, 2015

Summer Projects

Here is one of the many projects on the layout I've been working on this summer.


I finished off the fueling facility by making a simple platform from styrene and I used some parts from my parts box to create the gas pumps and added details. I still have not decided on what i want to do for the sanding storage, two ideas I keep looking at are using a old covered hopper or two styrene cylinders to simulate storage tanks. I also plan to add a new switch to the track lead so that two locos can be fueled at once.

Below is some pictures of other projects that are in progress on the layout. First is a new engine I picked up a bachman RS-3 in B&M maroon livery. 

Next is a few pics of random scenery I have reworked or added.

painted rock face added shrubs and ground cover




Friday, May 22, 2015


New signals and scenery part 2


The new signals are in place and testing is still on going, In the mean time I am working on the scenery in Grafton yard click here for some pictures.




Check out the Updates and Work bench pages for some current projects and layout progress.

Summer is here finally hope you all have a great summer!

Friday, March 20, 2015




Scenery and Signals

Well the temperature outside today is 9° F to cold to go out so what better time than to work on the train layout. For some time now I have been meaning to add some signals for the tunnels and finish a section of scenery that runs between them into the yard. I started with a little demolition to make room for the new signals I will put in this area. Once I had removed the plaster I used two pieces of foam to make the profile of the rock face. I shaped the foam by carving it with a knife and trimming it to fit the space I wanted to put it in. Once I got the foam looking the way I wanted I mixed up some Sculpt-A-Mold and filled in the cracks and voids in the foam to make the pieces all one rock face. While I was at it I decided to fill in the rest of the rock face I had started in the Grafton yard area too. Once the Sculpt-a-Mold was dry, it took a few hour to be hard enough to move on to the next steps. I started making the new signals for this area out of brass.

  
Once the whole thing was dry I started painting the rock face. I used a dry brush technique to shade the rocks and give the effect of sediments and layers in the rock face, I am not impressed with the result but it will work for now once I get scenery on them it might blend better to the scene.

After I finished the scenery I started work on the tracks as I had to add blocks to the layout in this section. I started with the first tunnel coming from Elliott Junction, I was not happy with the track work in this section so I re worked the area eliminating several issues inside the tunnel. I added a much needed re-railer in the tunnel and soldered all joints to created the first block. I then moved on to the other tunnel near Grafton yard. 



Some things learned:
1. Prep work is key and saves time and frustration later on.
2. Using a standardized wiring schematic is a must. many times I had reversed the common rail not realizing it.
3.Access points for tunnels are a must especially on blind corners.

In the next post I'll talk about how I made the circuits for the new signals.

Tuesday, September 23, 2014

First day of fall

Well fall is here again and the leaves have started to turn color. This is the time of year that things start to slow down for me and I have more time to work on the layout. I have a lot of new ideas and some old on my plate so here we go!

First up is a follow up to a long term project I have been working on. I first mentioned this project in my Amherst train show post. I have been working on a kit bashed GE U-23b locomotive with a modern era twist. Click here to see some pics and a little wright up about the loco.


Wednesday, July 2, 2014

 Summer Time


Well summer has finally arrived and also the heat stay cool everyone!
During the summer we all know how busy we can get but I will try to make some posts letting you know  how the layout is progressing.

First on to docket is some track work head over to the Work Bench and Update page to check out what I have done.

Second item is a pair of Athern old blue box U-23bs /U-30's not sure. I plan to update these U-boats with more modern power and add in a modern look to them. I plan on making a  blog series and you tube videos on them so keep an eye out for those in the future. I am starting to plan out the lower shelf level of the layout and will post some thoughts on this later on in the next post. This level is still undetermined if it will have scenery or be just for staging. 


Have a great summer everyone and a happy Fourth of July


Tuesday, April 1, 2014

Spring is here!


Check out the work bench page to see what the crew has been doing, some track work and new locos are on the to do list. 






 



  Also we spotted a new Genset loco in the Grafton Yard and MEC 402 finally leaves the shops with new paint and power

Monday, October 28, 2013

Fall Colors 

Fall is here, what does fall mean to you. For me it brings back memories of sipping hot apple cider and eating warm pumpkin pie it also brings back memories of rail fanning in Rigby yard. So in honor of fall memories I have finished another loco in Maine Central colors. Check out the link here MEC 402 for a full write up and pictures. On a recent trip back to Maine I went down to the old yard for some rail fanning to find the current owners had totally changed the landscape they tore down the roundhouse and engine shops it saddened me to see these once great and beautiful buildings have gone. Ahh yes the wonders of model railroading where days of past can live on forever!




Thursday, August 29, 2013

Lazy Hazy days of Summer

With Summer winding down and my work slowing down I have began to pick things up where I left off five or so months ago. I have finished the mill area track plan and have completed all track testing. Follow the links below

I added some small details to the sawmill scene the mill now has inhabitants. I added workers and some more vehicles to add realism.

Another project that I have finished is MEC 450 a hybrid GP7/9 engine. I found an old Athern blue box kit I had bought at a swap meet years back the price tag was still on it apparently I only paid 5.00 dollars for it. The tags on the box list it as DYM for dummy, so with a little ingenuity and a lot of spare parts I rebuilt the model. I started with the original shell of a gp-7 undecorated and modified a gp-9 chassis to fit the gp-7 shell then I searched my bottomless Athern spare parts bin and found the correct trucks that would fit the chassis. After that I made some custom hand rails and sanctions for the loco and finally I shot the whole thing out in MEC Harvest Gold and Pine green paint from Trucolor paints. I also upgraded the motor with a after market one to get real smooth operation out of the loco.

Follow the update  link for more Photos and details.


Monday, January 21, 2013

New for 2013

 New for 2013 I have finalized the upper track plan and have began laying track. Also I have started to layout the town scene. I have a lot of work ahead of me, lots of plastering and foam work ahead. The center piece of the upper route is the new trestle leading into a small industrial district I plan to model. This area will have a creamery and other industry to be determined, in this section, as space is limited. Work has progressed in the yard also I have finished some ballasting and fixed some issues with turnouts. follow this link for more pics and info.

Sunday, August 19, 2012

Fresh Paint

Check out the latest project a ex-MMA Atlas engine repainted in B&M blue
Cooler Weather and Fresh paint
Follow the link above to see more photos.