Sunday, August 14, 2016

New additions to the engine roster


The guys in the engine shops have done it again. This time they unveiled three new engine to be added to the fleet. Vermont Railway locos 201,603 and 006. Check out the pictures here.

New engine shops at Grafton yard

The new shops at Grafton are almost done. 
I have been working on the new shop portion of the layout for the last few months or so.




I still have to touch up a few things and add weathering to the building but over all the project is mostly complete.

 I detailed the interior of the shops with tool boxes and machines. I also added safety markings on the poles.









Here is a few more pictures of the exterior. I used a Walther's kit to create the scene I still have to scenic the area and hope to have that done soon.




Monday, February 8, 2016

03/31/2016

UPDATE:

I have been working on the bridge area of the layout and have completed the plastering and fitment of the piers and abutments. Also I have started the scenery. Once I am finished with this section I plan to move on to the mill area where I have been laying out the track work. Check out the pictures here or click on the updates link on the left side of the page.

02/08/2016

I have done a lot of  work on the improvements to the truss bridge check them out here or navigate to the layout updates page.

Wednesday, February 3, 2016

A new start

Happy NEW YEAR!!!

Well it's been several months since I have done anything on the layout or even thought about running trains. I have been either too busy or have had no ambition to work on the layout. This is all going to change. I have several tasks lined up in front of me. The first is a major cleaning in the train room and workbench areas they are, well lets say a F5 tornado would be child's play compared to the current state things are in. Once I get the mess organized and clean its down to business. First order is out standing projects I have several loco projects that are unfinished or in near completion states. I will be doing my best to get these completed so that I can have the room and focus on the next issue I have been meaning to tackle which is the bridge spanning the junction and the "mill/brewery" scene. I built this section in a hurry to get trains up and running and well frankly I hate the current design so back to the drawing board. I will keep the bridge layout and track plan more or less but totally redo the scenery and bridge supports.

 Another item on my list is to finally go through and edit all the videos I have been making for the YouTube channel I have a lot of material to edit and it will take some time to compile it all.
Please bear with me as I get things organized and moving forward. I will be making a more proactive approach to post something every month at least for the you tube channel and this blog. The over all plan for the layout this year is to finish the major scenery and track work so I can start planning the second part of the layout. A helix to a lower level about 30" or so off the ground. It is undetermined if this will be solely for staging or scenic-ed yet. Please stay tuned for further updates
 

Saturday, August 29, 2015

Summer Projects

Here is one of the many projects on the layout I've been working on this summer.


I finished off the fueling facility by making a simple platform from styrene and I used some parts from my parts box to create the gas pumps and added details. I still have not decided on what i want to do for the sanding storage, two ideas I keep looking at are using a old covered hopper or two styrene cylinders to simulate storage tanks. I also plan to add a new switch to the track lead so that two locos can be fueled at once.

Below is some pictures of other projects that are in progress on the layout. First is a new engine I picked up a bachman RS-3 in B&M maroon livery. 

Next is a few pics of random scenery I have reworked or added.

painted rock face added shrubs and ground cover




Friday, May 22, 2015


New signals and scenery part 2


The new signals are in place and testing is still on going, In the mean time I am working on the scenery in Grafton yard click here for some pictures.




Check out the Updates and Work bench pages for some current projects and layout progress.

Summer is here finally hope you all have a great summer!

Friday, March 20, 2015




Scenery and Signals

Well the temperature outside today is 9° F to cold to go out so what better time than to work on the train layout. For some time now I have been meaning to add some signals for the tunnels and finish a section of scenery that runs between them into the yard. I started with a little demolition to make room for the new signals I will put in this area. Once I had removed the plaster I used two pieces of foam to make the profile of the rock face. I shaped the foam by carving it with a knife and trimming it to fit the space I wanted to put it in. Once I got the foam looking the way I wanted I mixed up some Sculpt-A-Mold and filled in the cracks and voids in the foam to make the pieces all one rock face. While I was at it I decided to fill in the rest of the rock face I had started in the Grafton yard area too. Once the Sculpt-a-Mold was dry, it took a few hour to be hard enough to move on to the next steps. I started making the new signals for this area out of brass.

  
Once the whole thing was dry I started painting the rock face. I used a dry brush technique to shade the rocks and give the effect of sediments and layers in the rock face, I am not impressed with the result but it will work for now once I get scenery on them it might blend better to the scene.

After I finished the scenery I started work on the tracks as I had to add blocks to the layout in this section. I started with the first tunnel coming from Elliott Junction, I was not happy with the track work in this section so I re worked the area eliminating several issues inside the tunnel. I added a much needed re-railer in the tunnel and soldered all joints to created the first block. I then moved on to the other tunnel near Grafton yard. 



Some things learned:
1. Prep work is key and saves time and frustration later on.
2. Using a standardized wiring schematic is a must. many times I had reversed the common rail not realizing it.
3.Access points for tunnels are a must especially on blind corners.

In the next post I'll talk about how I made the circuits for the new signals.